Before adopting a local predictor-criterion study as the validation strategy, the test user should establish that it is technically feasible, meaning a stable job, a relevant and dependable criterion measure, a sample that represents the population of interest, and enough cases to estimate the relationship with confidence. If any one of these is missing, the user should take another validation route rather than press ahead with a weak local study.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.