For each deviation found, the auditor looks into what it was and why it happened, then decides whether: the deviations fall within the expected rate and are acceptable, so the tests still support effective operation; further testing of that control or of related controls is required; or the tests show the control failed to work effectively across the whole period.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.