SSAE 18 - Attestation Standards (SOC Reporting)
AT-C 205: Assertion-Based Examination Engagements – SSAE 18 - Attestation Standards (SOC Reporting)

SSAE 18 - Attestation Standards (SOC Reporting) 205.22: AT-C 205.22 Further Procedures

What does 205.22 require?

Further procedures are designed and performed whose nature, timing and extent rest on and respond to the assessed risks.

Maintained by Gerard BlokdykControl text last updated

Other controls in AT-C 205: Assertion-Based Examination Engagements – SSAE 18 - Attestation Standards (SOC Reporting)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.