Every requirement of a relevant AT-C section is complied with unless the whole section is irrelevant to the engagement or the requirement is conditional and its condition does not exist; the only other exception is the rare departure allowed by the paragraph on presumptively mandatory requirements.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.