South Korea ISMS-P
2.9 System and service operations management – South Korea ISMS-P

South Korea ISMS-P 2.9.2: Performance and incident management

What does 2.9.2 require?

Performance and capacity are monitored continuously against defined thresholds with a response when thresholds are exceeded; system failures are detected and handled promptly under procedure and recorded in failure reports; and serious failures get root-cause analysis and measures against recurrence.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in 2.9 System and service operations management – South Korea ISMS-P

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.