Controlled procedures govern moving newly introduced, developed or changed systems into operation; responses to transfer problems (such as rollback) are prepared; and only the files needed to run the service are installed in production.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.