SOC 1 (SSAE 18 / ISAE 3402)
Control objectives and controls: design, operation, deviations and change – SOC 1 (SSAE 18 / ISAE 3402)

SOC 1 (SSAE 18 / ISAE 3402) C.7: SOC 1 C.7 Changes to controls during the period managed so that superseded controls can be tested and the changes described

Changes to the system and its controls during a type 2 period are recorded so that the description can include them and the auditor can test superseded controls that were relevant to an objective before the change; where the auditor cannot, it determines the effect on the report.

Maintained by Gerard BlokdykControl text last updated

Other controls in Control objectives and controls: design, operation, deviations and change – SOC 1 (SSAE 18 / ISAE 3402)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.