The BCP and DR policy adopts best practice such as ISO 22301 to reduce the likelihood and impact of disruptions and maintain continuity, and is updated after major developments and risk assessments.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.