Gold criterion dynamic_analysis (MUST; group Analysis, Dynamic code analysis). Criterion text: The project MUST apply at least one dynamic analysis tool to any proposed major production release of the software produced by the project before its release. This raises the passing criterion of the same name (there SUGGESTED) to MUST at the gold level.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.