Gold criterion bus_factor (MUST; group Basics, Project oversight). Criterion text: The project MUST have a "bus factor" of 2 or more. This raises the silver criterion of the same name (there SHOULD) to MUST at the gold level.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.