OCEG GRC Capability Model (Red Book 2.1)
Measure (M) – OCEG GRC Capability Model (Red Book 2.1)

OCEG GRC Capability Model (Red Book 2.1) M2.2: Review and reconsider risks

What does M2.2 require?

Previously assessed and newly identified risks should be reviewed, and their priority reconsidered or set for the first time, using the best information available. The analysis draws on prevent, detect and respond activity including completed and ongoing investigations, on human capital control activity, and on context monitoring.

Maintained by Gerard Blokdyk

Other controls in Measure (M) – OCEG GRC Capability Model (Red Book 2.1)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.