NIST SP 800-53A Rev. 5
Chapter Three: The Assessment Process

NIST SP 800-53A Rev. 5 53A-3.2.2: Select Procedures to Assess the Controls

Selects the assessment procedures matching the controls in scope so that every in-scope control has a procedure behind it.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 5 controls across 5 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

CMMC 2.0 · 1 control

FedRAMP High · 1 control

  • CA-2 Control Assessments

FedRAMP Moderate · 1 control

  • CA-2 Control Assessments

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter Three: The Assessment Process

Query this from an agent

The graph holds this control, the 5 it maps to, and the evidence behind each claim, over MCP and REST.