NIST SP 800-53 Revision 5.1 HIGH
PE Physical and Environmental

NIST SP 800-53 Revision 5.1 HIGH PE-11: Emergency Power. Provide an uninterruptible power supply to facilitate [Selection (one or more): an orderly shutdown of the system; transition of the system to long-term alternate power] in the event of a primary power

Emergency Power. Provide an uninterruptible power supply to facilitate [Selection (one or more): an orderly shutdown of the system; transition of the system to long-term alternate power] in the event of a primary power

Other controls in PE Physical and Environmental

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.