NIST SP 800-53 Revision 5.1 HIGH
CM Configuration Management

NIST SP 800-53 Revision 5.1 HIGH CM-4(2): Impact Analyses | Verification of Controls. After system changes, verify that the impacted controls are implemented correctly, operating as intended, and producing the desired outcome with regard to meeting the security and privacy requirements

Impact Analyses | Verification of Controls. After system changes, verify that the impacted controls are implemented correctly, operating as intended, and producing the desired outcome with regard to meeting the security and privacy requirements

Other controls in CM Configuration Management

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.