NIST SP 800-53 Rev 5
CP - Contingency Planning

NIST SP 800-53 Rev 5 NIST800-CP-12: CP-12 Safe Mode

When [Assignment: organization-defined conditions] are detected, enter a safe mode of operation with [Assignment: organization-defined restrictions of safe mode of operation].

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 5 controls across 3 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 27001:2022 · 2 controls

  • 5.24 Information security incident management planning and preparation 
  • 5.29 Information security during disruption

PCI DSS 4.0 · 1 control

  • 12.1.3 12.1.3 Security roles defined and acknowledged by all personnel

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in CP - Contingency Planning

You are reading one control. How much of NIST SP 800-53 Rev 5 have you already done?

NIST SP 800-53 Rev 5 NIST800-CP-12 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of NIST SP 800-53 Rev 5 your existing evidence covers. Hold ISO 27001:2022 and 163 of 1014 NIST SP 800-53 Rev 5 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 342 were rejected on the ISO 27001:2022 pair alone.

Query this from an agent

The graph holds this control, the 5 it maps to, and the evidence behind each claim, over MCP and REST.