NIST SP 800-53 Rev 5 CM-2: Baseline configuration

Requires a current baseline configuration of the system to be developed, documented and held under configuration control, and reviewed and updated on a defined frequency, when defined circumstances require it, and whenever components are installed or upgraded.

Other controls in CM - Configuration Management

You are reading one control. How much of NIST SP 800-53 Rev 5 have you already done?

NIST SP 800-53 Rev 5 CM-2 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of NIST SP 800-53 Rev 5 your existing evidence covers. Hold ISO 27001:2022 and 163 of 300 NIST SP 800-53 Rev 5 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 342 were rejected on the ISO 27001:2022 pair alone.

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.