NIST SP 800-53 Rev 5 HIGH
MA: Maintenance – NIST SP 800-53 Revision 5.1 HIGH

NIST SP 800-53 Rev 5 HIGH MA-2: MA-2 Controlled Maintenance

a. Schedule, document, and review records of maintenance, repair, and replacement on system components in accordance with manufacturer or vendor specifications and/or organizational requirements; b. Approve and monitor all maintenance activities, whether performed on site or remotely and whether the system or system components are serviced on site or removed to another location; c. Require that [Assignment: organization-defined personnel or roles] explicitly approve the removal of the system or system components from organizational facilities for off-site maintenance, repair, or replacement; d. Sanitize equipment to remove the following information from associated media prior to removal from organizational facilities for off-site maintenance, repair, or replacement: [Assignment: organization-defined information]; e. Check all potentially impacted controls to verify that the controls are still functioning properly following maintenance, repair, or replacement actions; and f. Include the following information in organizational maintenance records: [Assignment: organization-defined information].

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 3 controls across 3 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

FedRAMP High · 1 control

  • MA-2 Controlled Maintenance

FedRAMP Moderate · 1 control

  • MA-2 Controlled Maintenance

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in MA: Maintenance – NIST SP 800-53 Revision 5.1 HIGH

Query this from an agent

The graph holds this control, the 3 it maps to, and the evidence behind each claim, over MCP and REST.