NIST SP 800-53 Rev 5 HIGH
CM: Configuration Management – NIST SP 800-53 Revision 5.1 HIGH

NIST SP 800-53 Rev 5 HIGH CM-2: CM-2 Baseline Configuration

a. Develop, document, and maintain under configuration control, a current baseline configuration of the system; and b. Review and update the baseline configuration of the system: 1. [Assignment: organization-defined frequency]; 2. When required due to [Assignment: organization-defined circumstances]; and 3. When system components are installed or upgraded.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 3 controls across 3 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

FedRAMP High · 1 control

  • CM-2 Baseline Configuration

FedRAMP Moderate · 1 control

  • CM-2 Baseline Configuration

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in CM: Configuration Management – NIST SP 800-53 Revision 5.1 HIGH

Query this from an agent

The graph holds this control, the 3 it maps to, and the evidence behind each claim, over MCP and REST.