NIST SP 800-53 Rev 5 HIGH
CA: Assessment, Authorization, and Monitoring – NIST SP 800-53 Revision 5.1 HIGH

NIST SP 800-53 Rev 5 HIGH CA-7(4): CA-7(4) Continuous Monitoring | Risk Monitoring

Ensure risk monitoring is an integral part of the continuous monitoring strategy that includes the following: (a) Effectiveness monitoring; (b) Compliance monitoring; and (c) Change monitoring.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 3 controls across 3 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

FedRAMP High · 1 control

  • CA-7(4) Continuous Monitoring | Risk Monitoring. Ensure risk monitoring is an integral part of the continuous monitoring strategy that includes the following: (a) Effectiveness monitoring; (b) Compliance monitoring; and (c) Change monitoring

FedRAMP Moderate · 1 control

  • CA-7(4) Continuous Monitoring | Risk Monitoring. Ensure risk monitoring is an integral part of the continuous monitoring strategy that includes the following: (a) Effectiveness monitoring; (b) Compliance monitoring; and (c) Change monitoring

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in CA: Assessment, Authorization, and Monitoring – NIST SP 800-53 Revision 5.1 HIGH

Query this from an agent

The graph holds this control, the 3 it maps to, and the evidence behind each claim, over MCP and REST.