NIST SP 800-207
Programme Management

NIST SP 800-207 SP800-207-7.2: Interoperability with Existing Controls

Ensure that ZTA integrates with existing security investments including SIEM, EDR, MDM, and ticketing systems. Avoid building parallel stacks that compete for telemetry and create blind spots.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Programme Management

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.