NIST SP 800-161 Rev 1
C-SCRM Family: Configuration Management

NIST SP 800-161 Rev 1 161R1-CM-8: System Component Inventory

Maintains the component inventory to the depth needed for supply chain purposes, including supplier, origin and support status.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 39 controls across 24 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

PCI DSS 4.0 · 4 controls

  • 12.3.3 12.3.3 Cryptographic cipher suite and protocol inventory reviewed annually
  • 12.3.4 12.3.4 Annual review of hardware and software technologies
  • 9.5.1.1 9.5.1.1 Current register of POI devices
  • 6.3.2 6.3.2 Inventory of bespoke software and components

CIS Controls v8 · 3 controls

  • CIS-1.1 Establish and Maintain Detailed Enterprise Asset Inventory
  • CIS-16.4 Establish and Manage an Inventory of Third-Party Software Components
  • CIS-2.1 Establish and Maintain a Software Inventory
  • NIST-CSF-ID.AM-01 Inventories of hardware managed by the organization are maintained
  • NIST-CSF-ID.AM-02 Inventories of software, services, and systems managed by the organization are maintained
  • NIST-CSF-ID.AM-04 Inventories of services provided by suppliers are maintained

NIST SP 800-172 · 3 controls

  • 3.14.3e Include Systems in Scope of Enhanced Requirements or Segregate into Purpose-Specific Networks
  • 3.4.3e Automated Inventory of System Components
  • 3.5.3e Prohibit Connection of Unknown or Unverified System Components
  • AUCDR-IS-3 Securely manage information assets over their lifecycle
  • AUCDR-IS-STEP2 Step 2 - Define the boundaries of the CDR data environment
  • ASBv3-AM-1 Track asset inventory and their risks
  • DS-2 Ensure software supply chain security

FedRAMP High · 2 controls

  • CM-8 System Component Inventory
  • CM-8(1) Updates During Installation and Removal

FedRAMP Moderate · 2 controls

  • CM-8 System Component Inventory
  • CM-8(1) Updates During Installation and Removal

NIST SP 800-53 Rev 5 · 2 controls

  • ANSSI-HYG-35 Anticipate the End of Maintenance of Software and Systems
  • CPS230-P25 Information and Technology Capability and Asset Health
  • SEC11-BP05 Centralize services for packages and dependencies

C5 (Germany) · 1 control

CMMC 2.0 · 1 control

  • STA-09 Service Bill of Material (BOM)

DORA · 1 control

ISO 27001:2022 · 1 control

  • 5.9 Inventory of information and other associated assets

ISO 27002:2022 · 1 control

  • 5.9 Inventory of information and other associated assets

ISO 27701:2019 · 1 control

  • 6.5.1 Responsibility for assets

NIST SP 800-218 · 1 control

UK Cyber Essentials · 1 control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in C-SCRM Family: Configuration Management

You are reading one control. How much of NIST SP 800-161 Rev 1 have you already done?

NIST SP 800-161 Rev 1 161R1-CM-8 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of NIST SP 800-161 Rev 1 your existing evidence covers. Hold C5 (Germany) and 94 of 191 NIST SP 800-161 Rev 1 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 0 were rejected on the C5 (Germany) pair alone.

Query this from an agent

The graph holds this control, the 39 it maps to, and the evidence behind each claim, over MCP and REST.