An SEPSS must give the loads power of the needed capacity, reliability and quality for a set period, starting within a set time after the normal supply is lost, fails or is disturbed, and it must include a way to recharge its stored energy.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.