New Zealand Information Security Manual (NZISM)
Chapter 18: Network security – New Zealand Information Security Manual (NZISM)

New Zealand Information Security Manual (NZISM) 18.1.10.C.02: 18.1.10.C.02 Formal change control for configuration changes

Every change to the network configuration should be recorded and approved through a formal change control process.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Chapter 18: Network security – New Zealand Information Security Manual (NZISM)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.