Agencies should have policy and procedures in place so that, once an information system has come to the end of its useful life within the organisation, it is decommissioned securely and then transferred or disposed of in a way that meets corporate, legal and statutory obligations.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.