For CONFIDENTIAL, SECRET and TOP SECRET systems, agencies should apply the good practice set out in the rationale of this block (10.6.31.R.01) when installing power cables: keep copper data cables apart from power cables; label power cords at both ends so the wrong cord is not unplugged by mistake; colour code power cords and power strips; and use locking power cords, receptacles or retention clips.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.