New Zealand Information Security Manual (NZISM)
Chapter 10: Infrastructure – New Zealand Information Security Manual (NZISM)

New Zealand Information Security Manual (NZISM) 10.6.29.C.01: Cabinet rail installation for cable management

What does 10.6.29.C.01 require?

For CONFIDENTIAL, SECRET and TOP SECRET systems, cabinet rails must be fitted so as to: leave enough room for patch cables and wire managers; leave enough space for cable management at the front, sides and rear; and place switches and patch panels so that patching between cabinets and racks is kept to a minimum.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Chapter 10: Infrastructure – New Zealand Information Security Manual (NZISM)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.