New Zealand Information Security Manual (NZISM)
Chapter 10: Infrastructure – New Zealand Information Security Manual (NZISM)

New Zealand Information Security Manual (NZISM) 10.6.22.C.01: Only approved cable groups terminate on a patch panel

What does 10.6.22.C.01 require?

Agencies must make sure that a patch panel has only approved cable groups terminated on it.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Chapter 10: Infrastructure – New Zealand Information Security Manual (NZISM)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.