NERC CIP CIP-010 R1.5: CIP-010-4 R1.5: Test changes in a test environment for high impact systems

Where technically feasible, before implementing a baseline-deviating change in production, test it in a test environment or in production in a way that minimizes adverse effects and models the baseline, to ensure CIP-005 and CIP-007 controls are not adversely affected, and document the results and any differences between test and production environments with the measures used to account for them.