The method should use iteration around a whole stage cycle, between neighbouring stages such as description and evaluation, migration planning and application governance, or change and vision, and within a single phase to build consistent products from several viewpoints.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.