The method must give guidance on architecture assessment and trade-off analysis, drawing on motivation data such as stakes, objectives and constraints, which may call for different criteria and different techniques when identifying and comparing alternatives.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.