NASA NPR 7150.2D Software Engineering Requirements
Chapter 4: Software engineering life cycle requirements – NASA NPR 7150.2D Software Engineering Requirements

NASA NPR 7150.2D Software Engineering Requirements SWE-190: Verify code coverage by analysing the results of test execution

What does SWE-190 require?

The project manager verifies that code coverage is measured by analysing the results of executing the tests, not by inspection or estimate.

Maintained by Gerard Blokdyk

Other controls in Chapter 4: Software engineering life cycle requirements – NASA NPR 7150.2D Software Engineering Requirements

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.