MTCS (Singapore)
8: Risk management – MTCS (Singapore)

MTCS (Singapore) 8.5: Risk register

Risk register: no Level 1 requirement. At Levels 2 and 3 the CSP keeps a risk register with specified attributes for each risk, including its priority level and control strategy, beyond ISO/IEC 27001's general requirement.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in 8: Risk management – MTCS (Singapore)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.