BCP and DR testing. Level 1: continuity and recovery controls verified and tested at regular intervals. Level 3 (a to c): testing at a defined frequency against specific test scenarios; backup of information; and protection of backups, including cryptographic controls.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.