MTCS (Singapore)
20: Change management – MTCS (Singapore)

MTCS (Singapore) 20.6: Patch management procedures

Patch management procedures. Level 1 (a and b): patch management procedures, and a process for bringing up to date systems that were offline or left unused for a period. Level 2 (a to d): risk ratings assigned to identified vulnerabilities; prioritised patching within defined periods; testing of patches before deployment; and management of systems dormant or offline for more than 30 days. Level 3 adds a further patch management requirement.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 27002:2022 · 1 control

  • 8.8 Management of technical vulnerabilities

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in 20: Change management – MTCS (Singapore)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.