MTCS (Singapore)
16: System acquisitions and development – MTCS (Singapore)

MTCS (Singapore) 16.4: System testing

System testing. Level 1: protection of test data. Level 2: a systematic programme of testing and evaluation, with management oversight, source code review and controls on using production data for testing; Level 3 is the same.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 27002:2022 · 1 control

  • 8.29 Security testing in development and acceptance

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in 16: System acquisitions and development – MTCS (Singapore)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.