MS 1722:2011 Occupational Safety and Health Management Systems Requirements
Clause 3.5 Action for improvement: preventive and corrective action, continual improvement – MS 1722:2011 Occupational Safety and Health Management Systems Requirements

MS 1722:2011 Occupational Safety and Health Management Systems Requirements 3.5.1: Preventive and corrective action arising from monitoring, audits and management review, applied by recognised control measures, completed and documented in a timely manner when controls prove inadequate

What does 3.5.1 require?

The organisation must establish and maintain arrangements for the preventive and corrective actions that result from performance monitoring and measurement, OSHMS audits and management reviews. When an evaluation of the system or another source shows that the preventive and corrective action taken on hazards and risks is inadequate or is likely to become inadequate, the response must follow recognised control measures and be completed and documented promptly and as appropriate.

Maintained by Gerard Blokdyk

Other controls in Clause 3.5 Action for improvement: preventive and corrective action, continual improvement – MS 1722:2011 Occupational Safety and Health Management Systems Requirements

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.