ISO/TS 22317:2021
Clause 5: The BIA process – ISO/TS 22317:2021

ISO/TS 22317:2021 5.5.4: Set RTO for the activities

What does 5.5.4 require?

The organization should set the recovery time objective for each activity: the time frame within which the activity is to be resumed after a disruption, shorter than the maximum tolerable period of disruption of the products and services it supports (introduction outcome e), using the impact over time evaluated against the criteria and time frames of 5.3.

Maintained by Gerard BlokdykControl text last updated

Other controls in Clause 5: The BIA process – ISO/TS 22317:2021

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.