The organization should set the recovery time objective for each activity: the time frame within which the activity is to be resumed after a disruption, shorter than the maximum tolerable period of disruption of the products and services it supports (introduction outcome e), using the impact over time evaluated against the criteria and time frames of 5.3.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.