ISO/IEC 27004:2016
Measurement construct examples (Annex B) – ISO/IEC 27004:2016

ISO/IEC 27004:2016 B.4: Management commitment

What does B.4 require?

Information need: management commitment and review activity. Measures: management review meetings completed to date, and the average participation rate in them; formulas: meetings performed divided by meetings scheduled, and the mean and standard deviation of participation rates. Target: the ratio between 0.7 and 1.1 concludes achievement with no action, and at least 0.5 concludes the least achievement; if the confidence limits on participation are wide, a large deviation may be possible and contingency plans may be needed. Evidence is the count of meetings scheduled, managers planned to attend (with a default entry for ad hoc meetings), planned, unplanned and rescheduled meetings held, and managers attending; collected monthly, analysed and reported quarterly, the measure reviewed every two years and applicable for two years; the quality system manager owns the information (assuming a combined QMS and ISMS), the quality and information security managers collect, the ISMS managers and quality system manager are the clients; data are the review plan and the minutes; reported as a line chart of the indicator against its criteria over several periods with a statement of results.

Maintained by Gerard BlokdykControl text last updated

Other controls in Measurement construct examples (Annex B) – ISO/IEC 27004:2016

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.