ISO/IEC 27004:2016
Measurement construct examples (Annex B) – ISO/IEC 27004:2016

ISO/IEC 27004:2016 B.25: Total availability

What does B.25 require?

Information need: how available each IT service is, judged against the maximum downtime set for it. Measure: the availability of each IT service from end to end, compared with the maximum availability excluding the predefined downtime windows; formula: total availability divided by maximum availability excluding downtime windows; target: the service availability target. Evidence is monitoring of end-to-end availability per service; monthly; IT operations owns, IT quality collects, the chief information officer is the customer; data are monitoring tools; reported per service as two lines, the actual availability per sampled period and the availability target.

Maintained by Gerard BlokdykControl text last updated

Other controls in Measurement construct examples (Annex B) – ISO/IEC 27004:2016

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.