ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection
Clause 8: Management system requirements (Option A and Option B) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection 8.7.4: Corrective action procedure elements

What does 8.7.4 require?

The procedures define requirements for identifying nonconformities, determining their causes, correcting them, deciding whether action is needed so they do not happen again, determining and implementing the actions needed in a timely manner, recording results, and reviewing the effectiveness of corrective actions.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Clause 8: Management system requirements (Option A and Option B) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.