ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection
Clause 8: Management system requirements (Option A and Option B) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection 8.7.3: Corrective actions proportionate to impact

What does 8.7.3 require?

Corrective action is scaled to how much harm the problem did or could do.

Maintained by Gerard Blokdyk

Other controls in Clause 8: Management system requirements (Option A and Option B) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.