ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection
Clause 8: Management system requirements (Option A and Option B) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection 8.3.2: Document control elements

What does 8.3.2 require?

The procedures define controls to approve documents before issue, review and update and re-approve them, identify changes and current revision status, make relevant versions available at points of use, keep documents legible and identifiable, identify and control distribution of external documents, and prevent unintended use of obsolete documents, marking any that are retained. Documentation includes software.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 8.3 Control of management system documents (Option A)

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Clause 8: Management system requirements (Option A and Option B) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.