ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection
Clause 6: Resource requirements (personnel, facilities and equipment, subcontracting) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection 6.3.2: Client informed of intention to subcontract

What does 6.3.2 require?

The body tells the client whenever it plans to pass part of an inspection to a subcontractor.

Maintained by Gerard Blokdyk

Other controls in Clause 6: Resource requirements (personnel, facilities and equipment, subcontracting) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.