ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection
Clause 6: Resource requirements (personnel, facilities and equipment, subcontracting) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection 6.1.8: Monitoring by personnel familiar with the methods

What does 6.1.8 require?

People who know the methods and procedures well monitor every inspector and everyone else engaged in inspection for satisfactory performance, using techniques such as on-site observation, report review, interviews and simulated inspections, and monitoring results are used to identify training needs.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Clause 6: Resource requirements (personnel, facilities and equipment, subcontracting) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.