ISO 27001:2022
Clause 9 – ISO 27001:2022

ISO 27001:2022 9.2.1: Internal audit: general

Internal audits must be carried out at planned intervals to give information on whether the ISMS conforms to the organization's own ISMS requirements and to this standard, and whether it is effectively implemented and maintained.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 14 controls across 10 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

COBIT 2019 · 3 controls

  • MEA04.03 MEA04.03 Determine the objectives of the assurance initiative
  • MEA04.06 MEA04.06 Execute the assurance initiative, focusing on design effectiveness
  • MEA04.07 MEA04.07 Execute the assurance initiative, focusing on operating effectiveness

ISO/IEC 38500:2024 · 2 controls

APRA CPS 234 · 1 control

  • 32 Para 32 Internal audit review of control design and operation
  • CERT.SELF Self-assessment against an approved standard, renewed every two years

ISO 13485:2016 · 1 control

  • 4.1 General requirements

ISO 14001:2015 · 1 control

ISO 14004:2016 · 1 control

  • 8.1.1 General guidance: Operational control

ISO 37301:2021 · 1 control

  • 9.2.1 Internal audit: general

ISO 45001:2018 · 1 control

  • 6.1 General concepts

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Clause 9 – ISO 27001:2022

You are reading one control. How much of ISO 27001:2022 have you already done?

ISO 27001:2022 9.2.1 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of ISO 27001:2022 your existing evidence covers. Hold NIST SP 800-53 Rev 5 and 79 of 93 ISO 27001:2022 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 170 were rejected on the NIST SP 800-53 Rev 5 pair alone.

Query this from an agent

The graph holds this control, the 14 it maps to, and the evidence behind each claim, over MCP and REST.