The exercise project should be designed and developed: its structure, the events, incidents and injects that drive it (5.2.14), the exercise documentation (plan, guidebook, administrative information, scripts and master events list) and the records to be kept, produced by the team so that the exercise can be conducted, controlled and evaluated as planned.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.