ISO 22398:2013 4.3.2: Monitoring exercise performance

What does 4.3.2 require?

The exercise programme manager should make sure each exercise project is evaluated effectively and efficiently, bearing in mind how results will be compared across the programme's life. Evaluating performance shows how maturity is changing, lets teams, sites or capabilities be compared, and points to what future programmes should develop; a uniform way of measuring how participants, procedures and capabilities perform should form part of how the organization evaluates. The evaluation method and criteria should judge the whole programme, projects included, against its aim and objectives; each performance objective should come with evaluation criteria fixed in advance and measurement methods applied the same way each time so project results can be compared over time, and one consistent set of objectives, aligned with the programme's, should run across the projects. Measures that can show trends include how long it takes to respond to particular injects, how long a call cascade takes, and how many resources are mobilised within a given time or area.

Maintained by Gerard Blokdyk

Other controls in Clause 4: Planning, conducting and improving an exercise programme – ISO 22398:2013

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.