ISO 21502:2020 6.4: Direct the project

What does 6.4 require?

The sponsor, with backing or supervision from the board, should verify that an organizational need is being met, that vision and objectives are shared alongside strategic assumptions and success criteria, that the case for the work still holds and is refreshed as governance requires, that the intended solution is likely to satisfy organizational needs, that capable and suitable resources are deployed, and that activity halts once the justification fails.