ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-4:2022 information exchange – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 4:6.4: 6.4 Exceptions

What does 4:6.4 require?

Containers that will not be revised or changed may be left out of review, as long as receivers check their quality, naming and metadata. Reviewers consider exempting electronic copies of physical evidence (administrative records, certificates, acceptance papers), live process-monitoring signals once automated filters and triggers have been configured and tested after first use, and photographs, scans and video.

Maintained by Gerard BlokdykControl text last updated

Other controls in ISO 19650-4:2022 information exchange – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.