Identified risks shall be ranked and acted upon by the laboratory, with each action sized to the possible effect on examination results and on the safety of patients and staff. Decisions and actions shall be recorded, built into and carried out through the management system, and checked for effectiveness. The document does not prescribe a risk method; ISO 22367 and ISO 35001 provide guidance.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.